5/02/05
We're working on windows and more stucco
We've got stairs from the second to the third floor on the inside and
most of the electrical, networking and telephone wiring is finished.
We're starting to think about insulation, horizontal bracing and any
reinforcement we need in the walls before sheet rock goes on.

Click HERE to return to older pictures
 
Trim going in around the windows. I'm not sure yet if I like it or not....
I do know that I love the arch in the top window.
 

The side showing that we have all the windows in except the third floor over the stairs. They're going to take a bit of work to reach.
Notice the new window in under the stairs on the first floor. Good idea that Bart had. It brightens up the room considerably
 
 In some ways it seems the stucco goes slower than the plywood did. It takes a lot of steps, lathe, then first coat, then drying, then the next. But, it doesn't seem to take a lot of material to go up one section or 3 floors (helps that we don't stucco where the windows are). I think what you see on the wall  took 10 bags.